Fact Sheet: The Ecolibrium™ Mixed Waste Facility
• The centrepiece of the Macarthur Resource Recovery Park is the EcolibriumTM Mixed Waste Facility, using world leading Arrowbio technology from the Arrow Ecology Group in Israel.
• Arrowbio is a proven technology that has been operating in a full-scale commercial plant in Israel for over three years.
• The EcolibriumTM Mixed Waste Facility that will be constructed at the Macarthur Resource Recovery Park is designed to process up to 90,000 tonnes of household waste each year and divert around 70% from landfill.
• At full capacity the Facility will recover enough green energy to power around 2,500 homes, 19,000 tonnes of recyclables, 10,000 tonnes of nutrient-rich organic fertiliser and generate more water and power than it uses.
• The process begins with a receival and pre-processing unit where large or hazardous items are removed.
• The second stage uses water to float light items such as plastics away from heavy items such as metals.
• The organic component of the waste stream is then treated with natural biological processes to produce water, stabilised organic material that may be used for a fertiliser and generate bio-gas that is used to produce enough green electricity to power around 2,500 homes.
• The Facility, which is largely enclosed, is designed to minimise odour emissions. Any exhaust air will be passed through a biofilter to further reduce odours.
• The use of a water-based process reduces the production of volatile organic compounds that are the main causes of odour.
• The Arrowbio process is designed to capture up to 100% of the biogas that is produced as waste breaks down.
• By keeping the waste out of landfill and using it to generate green energy, the plant will offset greenhouse gas emissions equivalent to taking 22,500 cars off the road each year.
• The Facility will generate more water than it uses, capturing the moisture in the waste to supply the water requirements of the process, and exporting excess water to be used for on-site irrigation purposes.
• The EcolibriumTM Mixed Waste Facility has a footprint of less than two hectares, so its environmental impact is kept to a minimum.
• The development will also be good for the local economy, providing between 30 and 50 jobs during the construction phase, and 40 full-time jobs when the EcolibriumTM Mixed Waste Facility and EcolibriumTM Organics Facility are operational.
More information
Download the brochure on the EcolibriumTM Mixed Waste Facility - Arrowbio for Mixed Waste.